美女视频黄频a在线视频久一区I91丨九色丨蝌蚪丨老版I天天玩夜夜操I影音先锋国产在线I日韩色资源I久久99精品国产麻豆婷婷I国产91精品一区二区I久久天堂AVI人人妻人人澡爽DVD盘锦I亚洲AV无码片久久精品I日本精品少妇I欧美性爽交A片大全秋霞I日本丰满熟妇一国产成人免费一I在线视频区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Bonterra Resources Extends Mineralization at Moroy Deposit-The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition
3/3/2020  緊固件展-緊固件采購會-國際緊固件展-fastener expo
---------------------------------------------------------------------------------------------------------------
    Bonterra Resources Inc announced that the recently completed drilling has extended the M1 Zone in the Moroy Deposit. Bonterra CEO Greg Gibson said "We are continuing to advance Moroy towards inclusion in a mine plan and we continue to execute our strategy of advancing resources in other targets at Moroy and our other assets, Barry and Gladiator, to support a long term mine life."

Assays have been received for drill holes recently completed on the M1 Zone in the Moroy deposit. The focus of the drilling has been the extension of the M1 Zone mineralization up-plunge using a drill from surface and down-plunge utilizing an underground rig. Highlights include an intersection of 15.27 grams per tonne Au over 3.39 metres in an up-plunge position and 8.14 g/t Au over an intersection length of 3.61 m extending mineralization down plunge. The new drill intercepts indicate a significant extension of the M1 Zone and, combined with re-interpretation of the existing drilling, supports a zone of demonstrated continuity beyond the limits used for the current resource estimate. Significant intercepts from the recently completed holes within the M1 Zone are contained in the table below. These holes, as well as those drilled on the M1 structure but outside of the plunging zone of mineralisation, are plotted on the long section attached.

The Company is currently completing a bulk sample on the 11th Level in the M1 Zone. The location of the bulk sample is indicated in the long section attached. In addition, the Company is completing selected in fill drilling to support future resource to reserve conversion and mine planning.

Gold analyses of Moroy drill core are completed at the Bachelor Mine assay laboratory. The Company employs an industry standard QAQC program that includes duplicate analyses from pulp and coarse rejects and the use of Certified Reference Materials (CRM) and blanks. Check assays on a minimum of 10% of the samples are completed at ALS Laboratories in Val-d''Or. 緊固件展-2020第二十一屆廣州國際緊固件及設備展覽會-巨浪展覽 -The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition - Fastener exhibition,2020 Fastener exhibition, China Fastener exhibition, Guangzhou Fastener exhibition, 2020 Fastener expo, China Fastener expo, Guangzhou Fastener expo
Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China